Right to Manage

Right to Manage in 2026: New Rules, Lower Costs, and Why More Leaseholders Are Taking Control

Share this articleIf you are a leaseholder who is fed up with poor building management, unexplained service charges, or a freeholder who simply does not seem to care, you may have more power than you realise. The Right to Manage (RTM) allows leaseholders to take over the management of their building from the freeholder, without […].

Right to Manage in 2026: New Rules, Lower Costs, and Why More Leaseholders Are Taking Control
In this article
Share this article

If you are a leaseholder who is fed up with poor building management, unexplained service charges, or a freeholder who simply does not seem to care, you may have more power than you realise.

The Right to Manage (RTM) allows leaseholders to take over the management of their building from the freeholder, without having to prove the freeholder has done anything wrong and without having to pay the freeholder for the privilege. And since changes that came into force in March 2025, more buildings qualify, and the process is cheaper than it used to be.

What Is the Right to Manage?

RTM is a statutory right introduced by the Commonhold and Leasehold Reform Act 2002. It allows qualifying leaseholders to take control of the management of their building by setting up an RTM company, serving a formal notice on the freeholder, and assuming management responsibilities after a set period.

Crucially, you do not need a reason. You do not need to prove the freeholder has breached their obligations or mismanaged the building. You simply need to meet the eligibility criteria and follow the correct statutory process.

What Changed in March 2025?

Some of the most important RTM reforms from the Leasehold and Freehold Reform Act 2024 came into force on 3 March 2025. These changes made RTM significantly more accessible:

1. More Buildings Now Qualify

Previously, RTM was unavailable in buildings where more than 25% of the floor area was non-residential (commercial units, retail, etc.). That threshold has now been increased to 50%. Many mixed-use blocks that were previously excluded from RTM, such as residential flats above shops, now qualify.

2. Leaseholders No Longer Pay the Freeholder's Legal Costs

Under the old regime, one of the financial risks of bringing an RTM claim was that if it failed, leaseholders could be liable for the freeholder's legal costs, sometimes running to thousands of pounds. That has changed. Leaseholders will generally no longer be required to pay the freeholder's legal costs, win or lose.

3. Freeholder Voting Rights Are Now Capped

In the RTM company itself, a landlord's voting rights are now restricted so that they can exercise no more than one-third of the votes compared to leaseholders. This prevents the freeholder from dominating the management company that was specifically set up to reduce their control.

Do You Qualify for RTM?

The basic eligibility requirements are:

  • The building must be a self-contained building or part of a building
  • At least two-thirds of the flats must be held on long leases (generally 21 years or more)
  • No more than 50% of the floor area may be non-residential (the new threshold)
  • The RTM claim must be supported by at least 50% of the long leaseholders in the building
  • The RTM company must be properly incorporated and the correct statutory notices served

What Does the RTM Process Look Like?

The process broadly follows these steps:

  1. Organise leaseholders: you will need at least 50% of qualifying leaseholders to participate.
  2. Incorporate the RTM company: a specific type of company with prescribed articles of association.
  3. Serve the Invitation Notice: a formal notice inviting all qualifying leaseholders to participate.
  4. Serve the Claim Notice: a formal RTM Claim Notice served on the freeholder and relevant third parties.
  5. Freeholder response: the freeholder may serve a counter-notice disputing the claim. Most RTM claims are not disputed.
  6. Acquisition: if the claim is not successfully challenged, the RTM company takes over on the date given in the Claim Notice. That date must be at least three months after the deadline for the landlord's counter-notice, which is itself at least one month after the claim notice, so allow at least four months.

Is RTM Right for Your Building?

RTM is not the right solution for every building. Taking on management responsibility requires commitment from the leaseholders involved: you become responsible for maintaining and administering the building, which means appointing a managing agent, collecting service charges, arranging insurance, and dealing with maintenance issues.

For buildings where the existing management is genuinely poor, or where leaseholders are motivated and organised, RTM can be transformative. The question is not just "can we do RTM?" but "are we ready to run the building well?"

If you want to understand whether RTM is an option for your building, get in touch with Lease Advice Bureau for a no-obligation discussion.

Talk to us about Right to Manage →

Share this article

This article is general information, not legal advice. Accurate as at 28 September 2026.

DT
Daniel Tang
Consultant Solicitor, Lease Advice Bureau

Daniel specialises in lease extensions, collective enfranchisement and the right to manage, acting for leaseholders across England and Wales.

About the team →

Have a question about your lease? We can help.

Have a no-obligation conversation with a specialist solicitor about your lease, your rights and your next step.

Questions about your lease?

Speak to a specialist solicitor, no obligation.

Get in touch
Privacy Policy
Disclaimer: the contents of this site do not constitute legal advice and should not be relied upon as a substitute for legal counsel
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram